| PRESUPUESTO GENERAL |
|
|
|
|
|
|
| PROYECTO: CONSTRUCCIÓN SISTEMA DE AGUA POTABLE COMUNIDAD
"GUARANGUAY" (AYANGO)EL CHACO |
|
|
| UBICACION: COMUNIDAD DE GUARANGUAY (YANGO) |
|
|
PLAZO |
|
| PROYECTISTA : |
"OPERASION AGUA" EQUIPO TECNICO |
|
|
REFERENCIAL |
|
|
|
|
|
85 DIAS |
|
|
|
|
|
|
| ITEM |
DESCRIPCION |
UNID |
CANTIDAD |
PRECIO |
COSTO |
|
| UNITARIO |
TOTAL |
|
|
|
|
| OBRA
DE TOMA |
|
|
|
|
|
| 1 |
INSTALACION DE FAENAS |
Glb |
1.00 |
638.24 |
638.24 |
|
|
| 2 |
REPLANTEO DE OBRA DE TOMA |
M2 |
8.00 |
2.75 |
22.00 |
|
|
| 3 |
EXCAVACION MANUAL TERRENO SEMIDURO |
M3 |
7.60 |
0.00 |
0.00 |
|
|
| 4 |
FUNDACION
DE HºCº TIPO "B" 50% P.D. |
M3 |
4.00 |
320.00 |
1,280.00 |
|
|
| 5 |
ELEVACIONES DE HºCº "TIPO B" CON 50% P.D |
M3 |
4.26 |
380.00 |
1,619.71 |
|
|
| 6 |
REVOQUE EXT. DE CEMENTO SOBRE HORMIGON |
M2 |
17.32 |
63.74 |
1,103.72 |
|
|
| 7 |
REVOQUE DE MORTERO CON SIKA - 1 (1:5 E=2,5 CM) |
M2 |
10.30 |
79.29 |
816.75 |
|
|
| 8 |
RECUBRIMIENTO IMPERMEABLE |
M2 |
10.30 |
79.13 |
815.10 |
|
|
| 9 |
PROV.
Y COLOC. GRAVA PARA PRE FILTRO (1 - 1,5 M) |
M3 |
4.32 |
159.45 |
688.82 |
|
|
| 10 |
CAMARA COLECTORA 0,6X0,6X0,75M |
PZA |
1.00 |
894.18 |
894.18 |
|
|
| 11 |
CAMARA DE
VALVULAS DE HºCº 0,4X0,4X0,5M |
PZA |
1.00 |
530.82 |
530.82 |
|
|
| 12 |
PROV. Y COLOC. ACCESO. OBRA DE TOMA |
GLB |
1.00 |
850.34 |
850.34 |
|
|
| LINEA
DE ADUCCION |
|
|
|
|
|
|
| 13 |
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA |
ML |
3000.00 |
0.39 |
1170.00 |
|
|
| 14 |
EXCAVACION ZANJAS SUELO SEMIDURO |
M3 |
569.80 |
0.00 |
0.00 |
|
|
| 15 |
EXCAVACION DE 0-2M SUELO DURO |
M3 |
244.2 |
0.00 |
0.00 |
|
|
| 16 |
PROV. Y COLOC. TUBERIA PVC D=2" CLASE 15 (ESP- CAMP) |
ML |
3000.00 |
22.66 |
67980.00 |
|
|
| 17 |
RELLENO MANUAL C/TIERRA CERNIDA (NO INCL.MATERIAL) |
M3 |
325.60 |
25.89 |
8429.78 |
|
|
| 18 |
RELLENO Y COMPACTADO MANUAL C/TIERRA COMUN |
M3 |
488.40 |
13.51 |
6598.28 |
|
|
| 19 |
PRUEBA HIDRAULICA - TUBERIA DE 1/2" HASTA 4" |
ML |
3000.00 |
0.31 |
930.00 |
|
|
| 20 |
DESINFECCION DE TUBERIAS (HASTA 4") |
ML |
3000.00 |
0.25 |
750.00 |
|
|
| TANQUE
DE ALMACENAMIENTO |
|
|
|
|
|
|
| 21 |
REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES |
M2 |
5.70 |
3.97 |
22.63 |
|
|
| 22 |
EXCAVACION DE 0-2M SUELO DURO |
M3 |
1.94 |
0.00 |
0.00 |
|
|
| 23 |
PISO DE CEMENTO + EMPEDRADO E=7CM TIPO "B" TANQUE |
M2 |
2.01 |
102.99 |
207.01 |
|
|
| 24 |
ACERA TIPO "B"+ EMPEDRADO E=5CM |
M2 |
3.30 |
75.16 |
248.03 |
|
|
| 25 |
HORMIGON DE FERROCEMENTO |
M3 |
2.19 |
6771.30 |
14857.59 |
|
|
| 26 |
HºAº PARA LOSA TAPA (TANQUE DE AGUA ) |
M3 |
0.03 |
1911.87 |
58.50 |
|
|
| 27 |
CAMARA DE VALVULAS DE HºCº 0,9X0,9X0,66M |
PZA |
2.00 |
732.30 |
1464.60 |
|
|
| 28 |
CAMARA DE ENTRADA DE HºCº 0,5X0,51X0,5M |
PZA |
2.00 |
530.82 |
1061.64 |
|
|
| 29 |
DESIFECCION DEL TANQUE (HIPOCLORITO AL 70%) |
M3 |
4.93 |
5.72 |
28.19 |
|
|
| 30 |
PINTURA LATEX -
EXTERIOR |
M2 |
17.88 |
44.59 |
797.10 |
|
|
| 31 |
PROV. Y COLOC. ACCESORIOS TANQUE D= 3/4" |
GLB |
2.00 |
2338.52 |
4677.04 |
|
|
| RED
DE DISTRIBUCION |
|
|
|
|
|
|
| 32 |
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA |
ML |
2500 |
0.39 |
975.00 |
|
|
| 33 |
EXCAVACION ZANJAS SUELO SEMIDURO |
M3 |
2000 |
0.00 |
0.00 |
|
|
| 34 |
EXCAVACION DE 0-2M SUELO DURO |
M3 |
500.00 |
0.00 |
0.00 |
|
|
| 35 |
PROV. Y COLOC. TUBERIA PVC D=1" CLASE 15 (ESP- CAMP) |
ML |
1000.00 |
16.58 |
16580.00 |
|
|
| 36 |
PROV. Y COLOC. TUBERIA PVC D=3/4" CLASE 15 (ESP- CAMP) |
ML |
500.00 |
11.58 |
5790.00 |
|
|
| 37 |
PROV. Y COLOC. TUBERIA PVC D=1/2" CLASE 15 (ESP- CAMP) |
ML |
1500 |
7.29 |
10935.00 |
|
|
| 38 |
PRUEBA HIDRAULICA - TUBERIA DE 1/2" HASTA 4" |
ML |
2500 |
0.31 |
775.00 |
|
|
| 39 |
DESINFECCION DE TUBERIAS (HASTA 4") |
ML |
2500 |
0.25 |
625.00 |
|
|
| 40 |
RELLENO MANUAL C/TIERRA CERNIDA (NO INCL.MATERIAL) |
M3 |
2500 |
0.00 |
0.00 |
|
|
| 41 |
RELLENO Y COMPACTADO MANUAL C/TIERRA COMUN |
M3 |
2500 |
0.00 |
0.00 |
|
|
| 42 |
CAMARA ROMPE PRESION 0,6X0,6X0,6M |
PZA |
1.00 |
1415.71 |
1415.71 |
|
|
| 43 |
PROV. Y COLOC. ACCESORIOS RED DE DISTRIBUCION |
GBL |
1.00 |
192.48 |
192.48 |
|
|
| PILETAS
DOMICILIARIAS |
|
|
|
|
|
|
| 44 |
PEDESTALES PILETAS PUBLICAS |
M3 |
20.00 |
354.12 |
7082.40 |
|
|
| 45 |
CONEXIONES
PILETAS PUBLICAS (6M PVC S/MEDIDO) |
PZA |
20.00 |
451.58 |
9031.60 |
|
|
| ESTRUCTURAS
ESPECIALES |
|
|
|
|
|
|
| 46 |
PASOS DE QUEBRADA L=6M D=3/4" |
PZA |
7.00 |
1042.49 |
7297.43 |
|
|
| 47 |
PUENTE COLGANTE ACUEDUCTO L=20M |
PZA |
5.00 |
3546.39 |
17731.95 |
|
|
| CERCO
MALLA OLIMPICA |
|
|
|
|
|
|
| 50 |
REPLANTEO CERCO PERIMETRAL |
M2 |
15.10 |
3.97 |
59.95 |
|
|
| 51 |
EXCAVACION DE 0-2M SUELO DURO |
M3 |
0.78 |
27.01 |
21.07 |
|
|
| 52 |
CIMIENTOS DE HºCº TIPO "B" 50% P.D. |
M3 |
0.78 |
402.43 |
313.90 |
|
|
| 53 |
SOBRE CIMIENTOS DE HºCº TIPO "B" 50% P.D. |
M3 |
0.42 |
602.40 |
250.60 |
|
|
| 54 |
PROV. Y COLOC. MALLA OLIMPICA ALAMB. Nº10 DE 3" |
M2 |
26.00 |
373.86 |
9720.36 |
|
|
| 55 |
PUERTA METALICA
CON MALLA OLIMPICA |
PZA |
1.00 |
567.84 |
567.84 |
|
|
| 56 |
ALAMBRE DE PUAS |
ML |
39.00 |
24.28 |
946.92 |
|
|
| |
|
|
|
|
|
|
|
| |
COSTO TOTAL DEL PROYECTO (Bs) |
|
|
|
208852.28 |
Bolivian Pesos |
|
|
|
|
|
| |
COSTO TOTAL DEL PROYECTO (DOLARES AMERICANOS) |
|
|
|
$29,582 |
US Dollars |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| TECNICO
PROYECTISTA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|